Hot DIP Galvanizing Formwork Anchor Tie Nut
Contact Supplier
Product Highlights
- Ductile Cast Iron Material: Made of QT450-10 ductile casted iron, stronger than standard steel.
- High Strength Performance: Pull strength reaches 170-180KN for secure formwork anchoring.
- HDG Surface Treatment: Hot dip galvanizing ensures superior corrosion resistance.
- Multi-Color Options: Available in Black, Silver, and Yellow to match project needs.
- Multiple Size Variants: Sizes range from 105MM to 130MM with weights from 0.8kg to 1.4kg.
- Customizable Rod Match: Design can be adjusted to match different rod requirements.
- Fast Off-Season Delivery: Lead time within 15 workdays during off-peak seasons.
- Professional Manufacturer: Established in 2007 with dedicated production and engineering departments.
Product Attributes
- Customization
- Available
- Material
- Steel
- Type
- Ductile Casted Iron
- Model NO.
- EA-001
- Structural Style
- Multi-Pole Scaffolding
- Framework
- Fix Formwork Tie Rod
- Supporting Mode
- Projecting Scaffolding
- Lapping Form
- Single Row Scaffolding
- Erection Position
- Fix Formwork Tie Rod
- Move Method
- Attached Lifting Scaffolding
- Scaffolding Part Type
- Tin Nut
- Construction Properties
- Building Scaffold
- Material of
- Ductile Casted Iron Qt450-10
- Weight
- 1kgetc.
- Surface Treatment
- HDG
- Color
- Black,Silver,Yellow
- Pull
- 170-180kn
- Specification
- Match tie rod: 12/17/20MM or customized
- Trademark
- Eaglerd
- Origin
- China
Product Images of Hot DIP Galvanizing Formwork Anchor Tie Nut
Find Similar Products
Product Description
Hangzhou Eaglerd Traffic Industry & Trade Co.,Ltd was founded in 2007. Our company
is a professional supplier of roadway safety and traffic facilities, we are engaging in
manufacture, construction and sale in the field of theroadway safetyproducts. "Safe road ,
Safe world" is our goal. We own Production Dept, Market Research&Purchase Dept,
Engineering Dept,SaleDept. We collect high-tech and use environmental-friendly material
to create our products.
Quality is our life and to serve customer ina better way is what we pursue.
Product
Hot dip galvanizing Formwork anchor tie nut
The tie nut is used for Fix formwork tie rod .It is made of ductile casted iron QT 450-10,stronger than steel.
Match with different rod.depends on cutomers' request.
High strength > 180kn
| ITEM | EA 001 | EA 002 | EA 003 | EA 004 | EA 005 | EA 006 |
| Size | 130MM | 130MM | 130MM | 110MM | 110MM | 105MM |
| Weight | 1.4kg | 1.1kg | 0.91kg | 0.9kg | 0.92kg | 0.8kg |
| Surface treatment | HDG | HDG | HDG | HDG | HDG | HDG |
| Color | Black,silver,yellow | Black,silver,yellow | Black,silver,yellow | Black,silver,yellow | Black,silver,yellow | Black,silver,yellow |
| Process | Casted iron | Casted iron | Casted iron | |||
| Pull | 170-180KN | 170-180KN | 170-180KN | |||
| Material | QT450-10 | QT450-10 | QT450-10 |
About the Supplier
This supplier has been audited by SGS. Verify the report on the official SGS website with ID "QIP-ASR2432160". Items marked "" are certified.
Company Profile
HangZhou Eaglerd Traffic Industry & Trade Co., Ltd is the professional supplier of roadway safety products and traffic safety products, one-stop supplier for traffic safety facility, 20 Years traffic safety field experience, 15 Years export experience...We got ISO9001 quality certificate and CE approval. Our products focus on the roadway safety and "Let the road more safety " is our purpose,
Our products are sold to worldwide, more than 100 countries purchased our products., Our market includes EU, USA, South America, Middle East, East South Asia, Africa, Russia, Australia etc. Our products include Raised Pavement Markers (road stud), Highway Guardrail, Road Marking Machine, Thermoplastic Paint, Solar Traffic Facilities(including solar road stud, solar traffic light, solar traffic signal), Highway Delineator, Reflective Sheeting for traffic sign, Fencing barrier serial, Glass Beads for road reflective marker, Rubber Speed Hump, Rubber Wheel Stopper, Rubber cable protector, Traffic light and controller, Traffic signal, Traffic Cone, , traffic barrier, warning products, Lane Divider, Convex Mirror and Dome Mirror, LED Street Light, Safety Vest, Anti-Glare Screen, Aluminum Profile and scaffolding Accessories. We have three producing base located on different industry zone. Our sales office located in Hangzhou city, near Shanghai and Ningbo port. Also we have our brandname " EAGLERD", Our competitive is professional and comprehensive with quality and price, you are warming welcome to cooperate with us.
About Our Factory & Business Background
- Address
- G426, No. 8, Xiyuan Nine Road, Hangzhou, Zhejiang, China
- Terms of Payment
- LC, T/T, Western Union, Money Gram
- International Commercial Terms(Incoterms)
- FOB, CFR, CIF, FAS, DDP, CIP, CPT, FCA, EXW
- Average Lead Time
-
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays - Nearest Port
- shanghai, ningbo
Our Production Capability & Technical Expertise
- Main Products
- Road Marking Machine, Guardrail, Traffic Cone, Traffic Light, Road Paint, Traffic Sign, Road Stud, Convex Mirror, Speed Bump, LED Street Light
Our Industry Experience & Global Business Record
- Export Year
- 2007-12-28
- Main Markets
- North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
FAQ
- What material is the tie nut made of?
- It is made of ductile casted iron QT450-10, which is stronger than steel.
- What is the pull strength of the product?
- The pull strength is between 170-180KN.
- What surface treatment is applied?
- The product features Hot Dip Galvanizing (HDG) for durability.
- What colors are available?
- Available colors include Black, Silver, and Yellow.
- What sizes and weights are offered?
- Sizes range from 105MM to 130MM, with weights from 0.8kg to 1.4kg.
- Can the product be customized?
- Yes, it can be matched with different rods depending on customer requests.
- What is the lead time for delivery?
- Peak season takes one month, while off-season delivery is within 15 workdays.
- What is the primary application of this nut?
- It is used for fixing formwork tie rods in scaffolding construction.
Send your message to this supplier
People who viewed this also viewed
-
US$8.50-10.50 / Piece
-
US$42.00-43.00 / Piece
-
US$42.00-43.00 / Piece
-
US$8.50-10.50 / Piece
-
US$2.60-3.60 / Piece
-
US$2.60-3.60 / Piece
-
US$1.10-1.15 / Piece
-
US$0.95-0.98 / Piece
-
US$4.80-6.00 / Piece
-
US$8.00-8.80 / Piece
Find Similar Products By Category
- Supplier Homepage
- Products
- Scaffolding
- Hot DIP Galvanizing Formwork Anchor Tie Nut
Related Categories
Hot Searches
- China Formwork Factories
- Tie Rod Factories
- Concrete Formwork Factories
- Type Swivel Factories
- Tie Anchor
- Formwork Nut
- Formwork Tie
- Tie Rod Nut
- Scaffolding Prop Nut
- Top 10 Formwork
- Formwork Trends
- Scaffolding Bulkbuy